Keel Laid: September 18, 1982
Launched: July 16, 1983
Commissioned: June 30, 1984
Decommissioned: May 23, 2014
Builder: Todd Pacific Shipyards Co., Los Angeles Division,
San Pedro, CA.
Propulsion system: 2 General Electric LM-2500 Gas
Turbine Engines
Length, overall: 453 feet
Beam: 45 feet
Draft: 24.6 feet
Displacement: 4100 tons
Speed: 29+ knots
Crew: 17 Officers 195 Enlisted
Aircraft: two SH-60 Sea Hawk (LAMPS MK III) helicopters
Armament:
- 1 MK-75 3"/62 caliber rapid fire gun - 1 MK-15 MOD 1 Close-in-Weapons System (CIWS)
- 6 MK-46 torpedoes (from two MK-32 SVTT triple mounts) |