Keel Laid: April 4, 1977
Launched: April 26, 1980
Commissioned: September 18, 1982
Stricken: August 2003
Activated: June 12, 2007
Builder: General Dynamics Electric Boat Division Co., Groton, CT.
Propulsion system: 1 S8G PWR
Length, overall: 560 feet (170.69 meters)
Beam: 42 feet
Draft: 32 15" feet (9.8 meters)
Displacement: 16764 tons (surfaced)
18750 tons (submerged)
Speed: 20 knots (surfaced)
25+ knots (submerged)
Depth: 800+ feet (operational)
approx. 1200 feet (safe depth)
approx. 1800 feet (crash depth)
Crew: 15 Officers 140 Enlisted; 66 SEALs
Armament:
- 22 tubes carrying 7 Tomahawks each (154 total)
- 4 torpedo tubes with MK 48 Torpedoes
- 2 tubes for UUVs
Homeport: Bangor, WA. |