Keel Laid: December 7, 2022
Christened: 2025
Commissioned: 2026
Builder: General Dynamics Electric Boat
Division Co., Groton, CT.
Propulsion system: 1 S9G PWR
Length, overall: 460 feet
Beam: 34 feet
Draft: 32 feet
Displacement: 10200 tons
Speed: 15 knots (surfaced)
30+ knots (submerged)
Depth: 800+ feet (operational)
approx. 1200 feet (safe depth)
approx. 1800 feet (crash depth)
Crew: 135 officers and men
Armament:
- 1 Virginia Payload Module (VPM) for 28 missiles
- 2 Virginia Paylod Tubes (VPT) for 12 missiles
- 4/21" TT for MK 48 ADCAP
- Advanced Mobile Mines - Unmanned Undersea Vehicles
Special Warfare:
- Dry Deck Shelter - Advanced SEAL Delivery System
|