Keel Laid: November 17, 2011
Christened: 2013
Commissioned: 2014
Builder: General Dynamics Bath Iron Works, Bath, Maine
Propulsion system: 2 Rolls-Royce Marine Trent-30 gas turbines
Propellers: two
Length, overall: 600 feet
Beam: 80.7 feet
Draft: 27.6 feet
Displacement: 14,500 tons full load
Speed: 30 knots
Aircraft: two SH-60B/R/F (LAMPS) helicopters
Armament:
- 2 155mm/62 Advanced Gun System (AGS)
- 2 MK-110 57 mm Gun System
- 20 MK-57 VLS (80 cells) for Standard Missiles, Anti-Submarine Rocket (ASROC), Tomahawk ASM/LAM and Evolved Sea Sparrow
Missile (ESSM)
|