USS RAFAEL PERALTA DDG 115 |
Keel Laid: October 30, 2014 Christened: October 31, 2015 Commissioned: July 29, 2017 Builder: General Dynamics Bath Iron Works, Bath, Maine Propulsion system: 4 - LM2500 GE Marine Gas Turbines Propellers: two Length, overall: 509.5 - 513.0 feet Beam: Max 66 feet Draft: 31 feet Displacement: 9,192-9,217 tons full load Speed: 31 knots Aircraft: two SH-60B/R/F (LAMPS MK III) helicopters Armament: - 1 MK-45 MOD 4 5"/62 caliber lightweight gun - 1 MK-15 20mm Phalanx CIWS - 2 MK-38 MOD 2 25mm Machine Gun System (MGS) - 2 MK-41 VLS (96 cells) for Standard Missiles, Anti-Submarine |