USS JOHN L. CANLEY ESB 6 |
Keel Laid: April 30, 2022 Christened: June 25, 2022 Commissioned: February 17, 2024 Builder: General Dynamics NASSCO, San Diego, CA. Propulsion system: commercial diesel electric propulsion Propellers: two Length, overall: 785 feet (239.3 meters) Beam: 164 feet (50 meters) Draft: 34.4 feet (10.5 meters) full load Displacement: approx. 90.000 tons full load Speed: 15 knots Crew: 5 Officers, 96 Enlisted Sailors and 44 Military Sealift Command (MSC) personnel Aviation: Up to 4 CH-53E heavy-lift transport helicopters Homeport: Apra Harbor, Guam |