USS CLEVELAND
LCS 31
  
 CVN  |  LHA/LHD  |  LPD  |  LSD  |  LCC  |  DDG  |  CG  |  SSN  |  SSBN  |  SSGN  |  AS  |  MCM  |  LCS   
  
U.S. Carriers  |  Decommissioned  |  Links  |  Info  |  History  

 

Keel Laid: June 16, 2021
Christened: April 15, 2023
Commissioned: 2024

Builder: Fincantieri Marinette Marine, Marinette, WI.
Propulsion system: Combined two diesel powerplants 
and two Rolls-Royce MT30 gas turbines, steerable 
water jet propulsion
Length, overall: 378.3 feet 
Beam: 57.4 feet 
Draft: 13 feet 
Displacement: approx. 3000 tons 
Speed: 40+ knots
Crew: 15 to 50 core crew members, 75 with detachments
Aviation: two MH-60R/S or one MH-60R/S and VTUAV's
Armament: 
 - 1 MK 110  57mm Gun system
 - 1 SeaRAM PDWS Launcher 
 - 2 MK 46 Mod 2 30mm GWS
 - Mk 50 Honeywell Torpedo
 - 2 .50 Cal Machine guns